During a pre-design investigation, a “hot spot” area was discovered in the NW area of the landfill. Loureiro was contracted to evaluate alternate technologies, and to design, install and implement the selected “hot spot” treatment system. An air sparging/soil vapor extraction system was selected, pilot tested, designed and installed in 2008. The system started operation in 2009 and removed over 43,000 lbs of VOCs. The system met objectives and has since been decommissioned.